Crowson Construction Hazard Assessment

Daily field-level hazard assessment for Sterling Homes framing work.

Job Information

GPS pin is optional. Phone/browser permission is required.

Crew list changes based on company. You can also type directly in the crew members box below.

Hazard assessments are to be conducted prior to starting work on a new project or in an unfamiliar way to identify potential hazards. The application of controls is the responsibility of the crew listed above.

Tap a hazard section to mark it applicable. When opened, select the hazards and controls that apply. Closed sections are treated as not applicable.

Attached Fall Protection Plan - Working at Heights

This section appears only when Working at Heights is selected. Edit the text below as needed for the site.

Required when “Inspect and use personal fall protection” is selected under Working at Heights.

Clearance reminder:
  • Clearance distance must be confirmed at the worksite before tying off.
  • Workers must ensure there is enough clearance to prevent contact with the ground, lower level, floor, material, equipment, or other obstruction.
  • Lanyard length, shock absorber deployment, worker height, anchor location, swing fall, and harness stretch must be considered before work begins.

Use this section to add photos of any site-specific hazard, condition, or concern that workers need to be aware of before starting or continuing work.

Limit: 1 to 3 photos.

Crew Review & Sign-Off

Each worker listed in Crew members signs here to confirm they reviewed and understand this hazard assessment. The person completing the assessment also signs here if they are part of the crew; no separate foreman signature is required.

Review Summary